• English
  • Bahasa Indonesia
  • Sumbawa Timur Mining

    Exploration

    Sumbawa Timur Mining
    Renewable Geothermal Energy Geothermal Exploration
    The Hu'u Project location not only holds mineral resources, but also has geothermal energy potential. STM is seeking to utilize this geothermal energy to support the future mining operation.
    Sumbawa Timur Mining
    2018
    In 2018, STM was granted a Geothermal Preliminary Exploration and Survey Assignment which enabled STM to conduct geothermal exploration. This area is estimated to up to 69 MWe of energy potential (Ministry of Energy and Mineral Resources of the Republic of Indonesia, 2023)
    2023
    Fast forward to 2023, STM has completed the Geothermal Preliminary Exploration and Survey Assignment. Through this exploration program, a geothermal reservoir was discovered. This offers STM a potential clean, renewable and sustainable energy source to support the mining operation.

    Unlike fossil fuels, geothermal energy is renewable and emits minimal greenhouse gases. STM has drilled one well using the slim hole drilling method to confirm the presence of a geothermal reservoir.

    This potential geothermal energy resource will be used by STM to support the company’s future mining operations.

    Sumbawa Timur Mining Sumbawa Timur Mining